A Working Vacation…
November 10th, 2009 — 06:31 pmSaturday
- Scrubbed and sealed the brick sunroom floor
- Picked up the new kitchen cabinets in Louisville
- Assembled the new kitchen table and four chairs
Sunday
- Laundry day!
- Assembled all the new kitchen cabinets
- Moved the old kitchen table and chairs into the newly finished sunroom
Monday
- Spent 3 hours online looking for a new kitchen faucet and sink online
- Ordered faucet (Delta)
- Picked out sink (Kohler)
- Went to Home Depot and ordered the Silestone countertop and sink
- Ran errands – groceries, school art supplies, sushi for lunch
- Jim baked a cake (no occasion, just a craving)
Today
- Paid bills (yuck)
- Posted new yarn on Etsy
- Loaded up the trailer and made a run to the county dump to get rid of cabinet boxes and other junk that had collected during the renovation
- Nailed the metal siding back down on the barn that the wind at torn loose over the year
- Installed the new 24 x 22 x 2 cutting board in the cabinet slot beneath the stove
- Installed trim over the front door where we put in a new storm door last month
- Got out the dreaded white paint (I hate painting white!) and painted the trim around the garage doors and the front door
- Burned the 3 brush piles that had collected from last month’s landscaping chores
Tomorrow
- Not sure what’s on the agenda for tomorrow but if the weather continues to hold out (in the 70’s) there may be more painting outside or landscaping
- Jim also wants to start dem0-ing the old kitchen island, although as soon as he does I’m without a kitchen sink for the next 2 months (waiting for the countertop to be custom made for the new island)…and yes, that means I’m sink-less through the holidays. Oh well.
Thursday
- Back to work. We’ll need to go back just to get some rest!!!


















